Total Pageviews

Translate

2/24/2022

 CHECKPOINT

Work on the runway upgrade is proceeding straight and level

  The runway surface has been ground up and removed;

                                                        Out with the Old

 Subsurface laid down, graded, leveled, and the first layer of asphalt rolled out!!

In with the New